Search

Of Pipes and Conduits

Comfort and Convenience from Top to Bottom One trade is responsible for installing the elevators and escalators. Spanning seven levels, the main terminal building is quite tall. To ensure…

More About

The Trick with a Gigantic Roof

Precise Preparations and Exacting Work Materials were temporarily stored just west of the main terminal building. The required rotating tower cranes were also installed there. The auxiliary…

More About

Dry Excavation

During times of peak activity, up to 300 truckloads of earth were excavated each day. Lots to Discover This interactive informational graphic provides an overview of the area, showing what was…

More About

Special Foundation Work

It Gets Wet During the special underwater engineering phase, the pit’s depth is increased from eight to 11 meters. This is necessary in order to build Terminal 3 so that departing travelers can…

More About

Vision

From Check-In to Shopping and Dining The heart of Terminal 3 beats where passengers start their trips and are welcomed back by their loved ones: in the main building. It has three zones: A…

More About

From the First to the Last Stone

The First Stone in the Wall The cornerstone ceremony took place at the Terminal 3 construction site on April 29, 2019 with about 700 invited guests. The stone contains a time capsule that was…

More About